Perangkat Sensor

Status Perangkat
Tambah perangkat, ubah status operasional, firmware, dan relasi pos.
PerangkatStatusBateraiSinyalTemperatureHumidityPosDataAksi
Camera North Highwall
dev-cctv-hw-01 · CCTV
Normal
x
71%
x
67%
27.8 C
84.4%
CCTV North Highwall
North Highwall
Sel, 19 Mei 08.24
Camera Settling Pond
dev-cctv-sp-01 · CCTV
Waspada
x
49%
x
55%
29.6 C
84.4%
CCTV Settling Pond
Settling Pond
Sel, 19 Mei 08.21
Dust Sensor Haul Road 01
dev-dust-haul-01 · WEATHER
Normal
x
72%
x
66%
30.8 C
66.4%
Dust Sensor Haul Road 01
Pit B
Sel, 19 Mei 08.16
Gas Sensor UG Portal 01
dev-gas-ug-01 · WEATHER
Normal
x
92%
x
81%
28.9 C
82.4%
Gas Sensor UG Portal 01
Tailing Dam
Sel, 19 Mei 08.27
Logger ADR North Highwall 01
dev-adr-hw-01 · GNSS
Normal
x
82%
x
76%
27.8 C
84.4%
ADR North Highwall 01
North Highwall
Sel, 19 Mei 08.28
Logger ADR Pit A 01
dev-adr-pit-a-01 · GNSS
Normal
x
89%
x
83%
30.4 C
75.4%
ADR Pit A 01
Pit A
Sel, 19 Mei 08.22
Logger ADR South Dump 01
dev-adr-dump-01 · GNSS
Waspada
x
61%
x
48%
28.7 C
91.8%
ADR South Dump 01
South Dump
Sel, 19 Mei 08.25
Noise Sensor Workshop
dev-noise-ws-01 · WEATHER
Normal
x
80%
x
73%
30.8 C
66.4%
Noise Sensor Workshop
Pit B
Sel, 19 Mei 08.13
Piezometer South Dump 01
dev-pz-dump-01 · WEATHER
Waspada
x
57%
x
52%
28.7 C
91.8%
Piezometer South Dump 01
South Dump
Sel, 19 Mei 08.19
Rain Gauge North Highwall
dev-arr-hw-01 · WEATHER
Normal
x
68%
x
64%
27.8 C
84.4%
ARR North Highwall
North Highwall
Sel, 19 Mei 08.27
Telemetry AWLR Settling Pond 01
dev-awlr-sp-01 · AWLR
Normal
x
74%
x
69%
29.6 C
84.4%
AWLR Settling Pond 01
Settling Pond
Sel, 19 Mei 08.30
Telemetry AWQR Settling Pond Outlet
dev-awqr-sp-01 · WEATHER
Normal
x
77%
x
71%
29.6 C
84.4%
AWQR Settling Pond Outlet
Settling Pond
Sel, 19 Mei 08.18
Weather Station Pit A
dev-aws-pit-a-01 · WEATHER
Normal
x
86%
x
78%
30.4 C
75.4%
AWS Pit A
Pit A
Sel, 19 Mei 08.20
Jadwal Maintenance
Buat jadwal, ubah teknisi, catatan pekerjaan, dan status progres.

Rain Gauge North Highwall

18 Mei 2026 15.00 · Teknisi Instrumentasi

Resolved

Pembersihan corong ARR setelah hujan lebat.

Piezometer South Dump 01

19 Mei 2026 10.00 · Teknisi Geoteknik

In Progress

Kalibrasi transducer piezometer dan validasi elevasi casing.

Gas Sensor UG Portal 01

19 Mei 2026 12.30 · Tim K3 Tambang

Open

Bump test sensor CO dan verifikasi alarm lokal.

Camera Settling Pond

20 Mei 2026 09.00 · Teknisi Instrumentasi

Open

Cek panel surya, baterai cadangan, dan sudut pantau Settling Pond.

Logger ADR South Dump 01

20 Mei 2026 11.00 · Teknisi Instrumentasi

Open

Pengecekan modem telemetry dan arah antena ADR South Dump.

Dust Sensor Haul Road 01

22 Mei 2026 09.00 · Tim Lingkungan

Open

Audit inlet sensor debu dan kalibrasi pembacaan PM10.